Competent person must be designated for: A. Scaffold erection; B. Inspections of excavations, the adjacent areas, and protective systems; C. Engineering survey prior to demolition of a structure D. Continuing inspections during demolition. E. All the Above

Competent person must be designated for: A. Scaffold erection; B. Inspections of excavations, the adjacent areas, and protective systems; C. Engineering survey prior to demolition of a structure D. Continuing inspections during demolition. E. All the Above
Competent person must be designated for:
A. Scaffold erection;
B. Inspections of excavations, the adjacent areas, and protective systems;
C. Engineering survey prior to demolition of a structure
D. Continuing inspections during demolition.
E. All the Above

Solution
4.4(287 votes)

Answer

E. All the Above Explanation A competent person is required for all the listed activities to ensure safety and compliance with regulations. This includes scaffold erection, inspections of excavations, engineering surveys before demolition, and ongoing inspections during demolition.

Explanation

A competent person is required for all the listed activities to ensure safety and compliance with regulations. This includes scaffold erection, inspections of excavations, engineering surveys before demolition, and ongoing inspections during demolition.