QuestionJuly 28, 2025

When attaching supply tubes to fixture shutoff valves with compression fittings, which of the following steps should you do first? A) Apply a small amount of pipe joint compound I to the threads. B) Bend the flexible copper supply tube and mark it to length. C) Insert the end of the pipe into the fitting. D) Tighten the compression nut with adjustable wrenches.

When attaching supply tubes to fixture shutoff valves with compression fittings, which of the following steps should you do first? A) Apply a small amount of pipe joint compound I to the threads. B) Bend the flexible copper supply tube and mark it to length. C) Insert the end of the pipe into the fitting. D) Tighten the compression nut with adjustable wrenches.
When attaching supply tubes to fixture shutoff valves with
compression fittings, which of the following steps should you do
first?
A) Apply a small amount of pipe joint compound I to the threads.
B) Bend the flexible copper supply tube and mark it to length.
C) Insert the end of the pipe into the fitting.
D) Tighten the compression nut with adjustable wrenches.

Solution
4.6(170 votes)

Answer

C) Insert the end of the pipe into the fitting. Explanation 1. Identify the initial step in compression fitting The first step is to insert the end of the pipe into the fitting, ensuring proper alignment before proceeding with other actions.

Explanation

1. Identify the initial step in compression fitting<br /> The first step is to insert the end of the pipe into the fitting, ensuring proper alignment before proceeding with other actions.
Click to rate:

Similar Questions