What term describes the MAXIMUM load that shall be applied in direct tension to undamaged straight length of a sling or hoisting equipment (always less than the breaking strength)? Lower Load Limit Maximum Load Limit Ultimate Strength Working Load Limit
What are the four main things to inspect on your rigging? Hardware , software , stitches, and I labels Ropes . shackles , slings, and I hitches Vertical, choker basket, and bridle Inside, outside , top, and bottom
Sonar is a type of __ active sensor passive sensor robot soil kit
Which of the following terms describe the traditional approach to engineering design? Check All That Apply Linear Sequential Nonlinear Simultaneous
What is the main way to establish an electrically safe work condition? A. Contracting the work out B. Having an electrician perform the work C: Implementing a lockout/tagout program D. Using insulated tools only
Effective values for A/C are called RMS values, RMS stands for __ really more sequence root mean sequence resistance means sequential root mean square
It is difficult to get metal parts to fuse properly when welding with a flame that is __ neutral harsh reducing soft
The most satisfactory method of welding sheets and light plates in all positions is __ backhand forehand multilayer fillet
To successfully vent air from a BC: Select one: You need to be in a perfectly vertical position. The exhaust valve you will be using must be the highest point on the air cell. You must activate the BC's overpressure relief valve. None of the above.
Which is the most common boat entry technique for deep water entry on large dive boats? Select one: Backward roll. Controlled-seated entry. Forward roll. Giant stride.
When installing structured cabling, why is it important to leave a service loop at both ends of the cable run? To make the installation look more professional and organized To increase the tension on the cable, ensuring a tighter fit To ensure that the cable can be easily pulled out for recycling To provide extra cable length for future reconnections or changes
2-Diga 3 requerimientos de codigo que tenemos que cumplir cuando instalamos un branch-circuit para el Laundry y el Water Heater.
TODAS LA MEZCLAS DE REFRIGERANTE TIENEN QUE CARGARSE AL SISTEMA EN FASE LIQUIDA. FALSO. VERDADERO.
Question 16(Multiple Choice Worth 3 points) (Lesson 8.3 LC) If the brake warning light comes on as you are driving, you should slow down and drive the vehicle home have the brake system inspected immediately and repaired as needed shut off the warning light ignore it the first time it happens
What's the best way to unroll a large spool of wire mesh? Cut the mesh at regular intervals. Stand on the open side as you unroll it. Unroll it down a slope. Turn the roll over.
What are the requirements for horizontal cabling in a structured cabling scheme?(Select two.) Must be within 90 m (295 feet)cabling distance of each wall port if using copper cabling. Can only be installed in ceiling spaces, not wall ducts. Must connect user work areas to an intermediate distribution frame (IDF) Must be made of fiber optic cable exclusively. Requires a wireless booster every 50 m to maintain signal strength.
True or False: You should always stand beneath the vehicle while it's being guided in to help the hood technician position the vehicle correctly.
True or False: If the removed oil plug shows any signs of damage, it should be replaced.
True or False: Pit technicians should always clean the Vehicle's grease fittings during service.
True or False: It's possible to check a vehicle's CV boots by hand squeezing them.