Milan is on a design team that needs to run a hardened carrier PDS underground between two buildings. What requirement would Milan add to the specifications?
a. It must be buried at least 25 feet below surface level.
b. It can only be used for fiber-optic cables.
c. It must be visually inspected on a weekly basis.
d. It must be encased in concrete